Academic Journals Database
Disseminating quality controlled scientific knowledge

ON REPRESENTING FACTORS INFLUENCING TIME PERFORMANCE OF SHOP-HOUSE CONSTRUCTIONS IN SURABAYA

ADD TO MY LIST
 
Author(s): Andi Andi | Susandi Susandi | Hendra Wijaya

Journal: Civil Engineering Dimension
ISSN 1410-9530

Volume: 5;
Issue: 1;
Start page: 7;
Date: 2003;
Original page

Keywords: time performance | influencing factors | shop house | anova.

ABSTRACT
Some shop-houses were built late and others are on time, or faster than the schedule that had been planned. The questions are how it could happen and what kind of factors that made it happened. This research has an objective to investigate time performance of shop-house constructions in Surabaya by representing factors that influence it. It first assembles potential influencing factors through literature review, and second, conducts an empirical study by collecting data from finished thirty-two shop-house projects throughout the city. Results of analyses using one-way analysis of variance (ANOVA) indicate eight factors to be statistically significant influencing time performance. They are construction design change, schedule of work that will be done, workers discipline, material availability, owner’s payment, quality control, workers availability, and material delivery. The paper discusses the factors and proposes possible solutions to improve time performance.
     Get a faster system with an easy scan today!